Approved the specifications for the tender for the urbanization works of the EU-39 road

Approved the specifications for the tender for the urbanization works of the EU-39 road

The Local Government Board has adopted the agreement to approve the specifications for the tender for the works of the UE-39 road, in the El Litoral urbanization, next to Felipe Street, with a base budget of 139,214.75 euros , the execution period being 2 months.

This project aims to provide the road with new structures, as well as improve accessibility and the elimination of architectural barriers. As this is an action on a consolidated street, no earthworks or walls will be carried out.

The road will be made of cobblestones, remaining a semi-pedestrian road, with circulation limited to residents' vehicles. The road area will be made of gray paving stones, while red paving stones will be used in the pedestrian area.

The planned wastewater collection network will be connected to the existing network on Philippine Street.

Book your transfer now
Today's weather in Nerja

Overcast

19ºC / 66.2ºF

  • Max: 19ºC / 66.2ºF
  • Min: 14ºC / 57.2ºF
  • Chance of rain: 0%
Book your transfer now


Visit Nerja Caves